Case studies

Please click on the link below to download a pdf-file with a detailed description of a specific BioPrePlant-System installation.
Do return to this section of biopreplant.com as we will add additional information from time to time.


  Plant Upgrade

Ecopro Verdal, Norway.

An estimated saving of
€ 300 000 per annum.

Installation of the BioPrePlant-System has reduced
Ecopro’s cost for incineration significantly.


  Click to open Case Study as PDF.